Work on the Student Study Lounge project on the 8th floor may begin at any time. The construction partition to isolate the work area will be erected, and demolition work will start. Let the fun begin!
- Please expect noise from the demolition activities. Earplug dispensers are available throughout the building.
- 8th floor book stacks will be accessible via the Old Wing. Elevator access to the 8th floor will be limited to the elevators in the Old Wing (Library Lawn side).
- Public access via stairwells and elevators in the Flowers wing (21st Street side) will stop at the 7th floor.
- 8th floor restrooms will be inaccessible.
We appreciate your support while we renovate the library!